Billy: October 5-11

journal entry posted by wrbeaudo on October 12, 2009 12:17am

categories: ncsu | activity reports | billy

  • ENGR - Firefox upgrade, Quicktime upgrade, and deleted almost 200 objects. More cleanup needed.
  • Mediasite - Did some diagnosis on the issues with one of the EX nodes and then got comtech to pull it from the load balancer.
  • Architect - More reviewing resumes.
  • FF+GW - Diagnosing the Firefox upgrade interaction with Groupwise. Turns out, if you don't have a default web browser set, the Groupwise spell checker crashes GW. Awesome.
  • ITRE Firewall - Working with Comtech to get it setup correctly so that we can setup a one-way AD trust.

Meetings:

  • IAM Conf Call
  • IES VMware 1
  • Shibboleth
  • NDSTech
  • Mac AD Permissions
  • IAM Service Team
  • IES VMware 2
  • Download.eos

Comments (0)

Add A Comment

The trackback link for this page is: http://www.itecs.ncsu.edu/systems/site/trackback/-53b4cc85c1665e2dd54e514018e86bce

Powered by ewe